Quality and stability · Stability and quality
“The mass balance in our stress study doesn't close, and we don't know where the missing part went.”
Forced degradation study: degradation products and mass balance
A stress study under ICH Q1A(R2) should show how an API degrades and whether your method captures every degradation product. CovaSyn predicts likely degradation pathways from structure, assigns observed masses and checks the mass balance. You receive a report that your analytical team reviews and approves.
When you need this
- After stress, assay plus degradation products adds up to well below 100 percent.
- Peaks appear in the chromatogram of the stressed sample whose structure nobody knows.
- A stress study has to be planned for a new substance, and conditions and target degradation are open.
- An authority or a sponsor asks whether your method is stability-indicating.
What it costs when the case stays open
- An open mass balance raises doubts whether the method captures all degradation products, and the authority will ask.
- Degradation products stay undetected until they appear in the stability study.
- The submission waits, and every question from the authority costs weeks.
What you get
Predicted degradation pathways
Likely degradation products under hydrolysis, oxidation, photolysis and heat, with mass and the functional group that reacts.
Mass balance check
Assay and degradation products reconciled, with the usual causes of gaps such as differing response factors and volatile or undetectable products.
Stress study design
Stress conditions under ICH Q1A(R2) and Q1B, sampling points and a target degradation of about 5 to 20 percent by common practice; ICH itself sets no value.
Toxicological classification
Structural alerts for the degradation products and a preliminary ICH M7 assessment, so you know which peaks need particular attention.
From an open case to a approved report
1. Discuss the case
30 minutes on Microsoft Teams about the compound, the question and the data. Afterwards you know whether we take on the case and which data we need.
2. Hand over the data
Raw data and context, such as spectra, chromatograms, stability tables and the specification. The report typically arrives within 5 working days once we have your complete data.
3. Review and release
The report states its data basis, calculation path and limits. Review and release happen on your side under your quality system.
What we evaluate for this
Every number is computed and reproducible, predictions state their uncertainty. Every evaluation is documented with its input data and reasoning so your expert can review and sign it off.
Degradation products predicted and assigned
Stress study planning, degradation product prediction, assignment of measured masses and mass balance calculation.
Stress data evaluated
Evaluation of stress data across conditions, with degradation rates and comparison of samples.
Toxicology: ICH M7 assessment
Structural alerts and ICH M7 assessment for every proposed degradation product, with an applicability domain check.
Who it is for
For analytical, QC and CMC teams at contract labs, CDMOs and generics manufacturers who plan, evaluate or justify stress studies to sponsors and authorities.
What the computation does not replace
- Predictions do not replace measurement. A structure only counts as confirmed once a reference standard (matching retention time and MS/MS spectrum) or NMR data support it.
- A mass balance gap can be narrowed down, but not always closed from existing data. Often a second detector or a response factor from your lab is needed.
- The ICH M7 classification is a model-based preliminary assessment and does not replace review by your toxicologist.
Read on
Planning a Forced Degradation Study under ICH Q1A(R2)
Forced degradation study design under ICH Q1A(R2): stressor choice, target degradation, mass balance and stability-indicating methods, with real results.
Read articleMass Balance in Forced Degradation: Why It Does Not Close
Why mass balance in forced degradation rarely closes: non-chromophoric and volatile degradants, adsorption and response factors, plus how to close the gap.
Read articleUnknown Impurity Identification by LC-MS/MS
Unknown impurity identification by LC-MS: formula from accurate mass, RDBE, isotope pattern and MS/MS fragment logic, with a worked example.
Read articleICH M7 Classification: Class 1 to 5, by Example
ICH M7 classification explained class by class, with the dual (Q)SAR assessment and five real impurities scored, including NDMA.
Read articleSignificant Change Under ICH Q1A: What Triggers It
Significant change ICH Q1A explained: the exact assay, degradant, dissolution and physical triggers, and what intermediate testing you owe once it fires.
Read article
Common questions
What to do when the mass balance in forced degradation doesn't close?
First check whether the degradation products have a different response factor than the API, whether volatile or non-UV-active products form and whether something stays on the column. CovaSyn predicts from structure which products are likely and shows which of them your method might miss. That turns a gap into a targeted follow-up measurement.
How do I design a stress study under ICH Q1A(R2)?
Typical conditions are acid and base hydrolysis, oxidation, heat, humidity and light under ICH Q1B, with a target degradation of about 5 to 20 percent. Excessive stress creates secondary degradants that are not relevant to storage. CovaSyn proposes conditions that match the reactive groups in your molecule.
How can I predict degradation products?
From the structure you can derive which groups hydrolyse, oxidise or react under light, and which masses result. CovaSyn builds that list and matches it against your measured masses, so unknown peaks get a structure proposal faster.
Do degradation products need an ICH M7 assessment?
Degradation products that actually occur or are expected in stability studies belong in the ICH M7 assessment. CovaSyn screens every proposed degradation product for structural alerts and provides a preliminary assessment that your toxicologist confirms or rejects.
Who can evaluate our forced degradation study for us?
We do. In the initial call we go through substance and data and agree on scope. The report typically arrives within 5 working days once we have your complete data.
Related problems we solve
Nitrosamine risk assessment: identify and justify NDSRIs
The authority wants to see our nitrosamine risk assessment, and we don't know whether our API can form an NDSRI.
See solutionStability data evaluation: detect OOT and estimate shelf life
One result in our stability study looks different from the earlier ones, and we don't know whether it's a trend or just scatter.
See solutionClose OOS investigations faster and with full traceability
We have an OOS result, the batch is on hold, and the investigation hasn't reached a conclusion for weeks.
See solutionClear the batch release backlog: review release data
Batches pile up before release because reviewing the data takes days every time.
See solution
Free PDF
Results you can rely on
Our beginner's guide for chemistry, pharma and biotech: how to tell an estimate from a calculation, seven questions to ask of every result and six questions to ask every provider. 8 pages.
Next step
Tell us about your stress study.
30 minutes on Microsoft Teams with the CovaSyn team. If it is not a fit, we will say so.

