Quality and stability · Batch release
“Batches pile up before release because reviewing the data takes days every time.”
Clear the batch release backlog: review release data
Before your QP releases a batch, the results have to be checked against specification and anomalies in the trend assessed, and that is exactly where the backlog builds up. Process capability and trends across many batches belong in the product quality review. CovaSyn evaluates your release data across all batches, flags deviations, trends and rule violations and calculates process capability. You receive an overview with its reasoning that supports your internal data review and makes the QP's review easier.
When you need this
- Finished batches wait for release because data review cannot keep up with production.
- A result is within specification but close to the limit, and nobody knows whether that is already a trend.
- The annual product quality review is due, and the trend evaluation for the year is missing.
- A sponsor or auditor asks for Cpk and control charts for the critical quality attributes.
What it costs when the case stays open
- Batches sit in the warehouse instead of at the customer, and delivery dates slip.
- A creeping trend is noticed only when a batch falls out of specification and is blocked.
- Missing trend evaluation in the product quality review becomes an audit finding.
What you get
Check against specification
Every release result against its limits, with results close to the limit flagged separately.
Control charts and trends
Control charts for the critical quality attributes across all batches, with rule violations and shifts shown before they become a deviation.
Process capability Cpk and Ppk
Process capability per attribute with a check of the distribution, so you know how reliably your process meets the specification.
Overview for release
An overview per batch and for the period, with input data and justification, which supports your internal data review and can feed into the product quality review.
From an open case to a approved report
1. Discuss the case
30 minutes on Microsoft Teams about the compound, the question and the data. Afterwards you know whether we take on the case and which data we need.
2. Hand over the data
Raw data and context, such as spectra, chromatograms, stability tables and the specification. The report typically arrives within 5 working days once we have your complete data.
3. Review and release
The report states its data basis, calculation path and limits. Review and release happen on your side under your quality system.
What we evaluate for this
Every number is computed and reproducible, predictions state their uncertainty. Every evaluation is documented with its input data and reasoning so your expert can review and sign it off.
Control charts with rule violations
Control charts for individuals and moving ranges (I-MR), with the usual rules for outliers, runs and shifts.
Process capability calculated
Cpk and Ppk per attribute, with a check of whether the data supports the calculation.
Trend and OOT detection across all batches
Unusual results are checked against the course of comparable batches, not only against the specification.
Who it is for
For QA, QPs, QC and production management at drug product and API manufacturers and CDMOs where reviewing release data has become the bottleneck.
What the computation does not replace
- Releasing a batch remains your QP's decision. The evaluation prepares it and does not replace it.
- Process capability only becomes reliable with a sufficient number of batches. With few batches we state the uncertainty.
- We evaluate the data you provide. Completeness and correctness of the raw data stay in your system.
Read on
Cpk vs Ppk: In Control Is Not the Same as Capable
Process capability for pharma: what Cpk and Ppk actually measure, why a stable process can still miss target, and a worked example with real SPC.
Read articleOOT vs OOS in Stability Data: Catching Drift Early
Out of trend stability data explained: how OOT differs from OOS, when regression, CUSUM and Shewhart methods fire, and a worked example.
Read articleUV Dissolution Testing: f2, Sink Conditions, Limits
UV dissolution testing end to end: calibration, ICH Q2(R2) validation, f1/f2 similarity, sink conditions, and where UV loses to HPLC, with a worked example.
Read article
Common questions
How can the batch release backlog be reduced?
Most of the time usually goes into reviewing results against specification and trend. When that review is prepared and anomalies are already flagged, your QP can concentrate on the points that really need a decision.
Which control charts suit release data?
For single results per batch, individuals and moving range charts are common. What matters are rules that detect not only values outside the limits but also runs and shifts that announce a trend.
What Cpk is sufficient in pharmaceutical manufacturing?
A Cpk of at least 1.33 is often used as the target for a capable process, and more is often expected for critical attributes. More important than the number is whether the data is stable and approximately normally distributed, otherwise the value is not meaningful.
Does the evaluation also help with the product quality review?
Yes. Trends, control charts and process capability over the review period are core parts of the product quality review. CovaSyn delivers this evaluation with justification, so your QA can take it over.
Who can review our release data?
We do. In the initial call we go through product and data and agree on scope. The evaluation typically arrives within 5 working days once we have your complete data.
Can we use the report in a GMP environment?
Yes, as the basis for your assessment. For evaluations in a GMP environment we sign a quality agreement on request, answer your supplier questionnaire and accommodate a supplier audit. Every report states the input data, the calculation path and its version. Assessment stays with your QA, batch release with your QP.
Related problems we solve
Forced degradation study: degradation products and mass balance
The mass balance in our stress study doesn't close, and we don't know where the missing part went.
See solutionNitrosamine risk assessment: identify and justify NDSRIs
The authority wants to see our nitrosamine risk assessment, and we don't know whether our API can form an NDSRI.
See solutionStability data evaluation: detect OOT and estimate shelf life
One result in our stability study looks different from the earlier ones, and we don't know whether it's a trend or just scatter.
See solutionClose OOS investigations faster and with full traceability
We have an OOS result, the batch is on hold, and the investigation hasn't reached a conclusion for weeks.
See solution
Free PDF
Results you can rely on
Our beginner's guide for chemistry, pharma and biotech: how to tell an estimate from a calculation, seven questions to ask of every result and six questions to ask every provider. 8 pages.
Next step
Tell us about your release process.