Skip to content
CovaSyn
Intro call

Methods and process · Process development

“Our Cpk is too tight, and we don't know which parameter drives the variation.”

Process optimization and process capability (Cpk, Ppk)

A process that only just meets specification costs batches and deviation reports. CovaSyn analyses your process and batch data, calculates Cpk and Ppk, shows which parameters drive variation and proposes ranges for a design space under ICH Q8(R2) for you to confirm experimentally. You receive a report that your expert reviews and approves.

When you need this

  • Process capability for a critical quality attribute is not sufficient, and the cause is unclear.
  • The submission needs a design space under ICH Q8(R2) with justified ranges, i.e. PAR as defined by ICH and normal operating ranges (NOR) according to your practice.
  • PPQ is coming up, and you want to know beforehand whether process and data hold up.
  • Values shift slowly in routine production, and the control chart does not yet show a clear violation.

What it costs when the case stays open

  • Batches run close to the specification, and every deviation costs an investigation.
  • Rejects and rework eat into the margin.
  • Without knowing the drivers, the wrong parameters get adjusted.

What you get

  • Cpk and Ppk with interpretation

    Within-subgroup capability (Cpk) and overall performance (Ppk) per quality attribute, with a check of the distribution assumption and whether location or spread is the problem.

  • Drivers of variation

    Process parameters ranked by influence, with sensitivity and indications of causal relationships in the data.

  • Design space and robustness

    Ranges in which the process meets specification with margin, robustness against fluctuations and proposals for established conditions under ICH Q12.

  • Drift and control charts

    Detection of gradual shifts across batches, control charts and an assessment of PPQ readiness.

From an open case to a approved report

  • 1. Discuss the case

    30 minutes on Microsoft Teams about the compound, the question and the data. Afterwards you know whether we take on the case and which data we need.

  • 2. Hand over the data

    Raw data and context, such as spectra, chromatograms, stability tables and the specification. The report typically arrives within 5 working days once we have your complete data.

  • 3. Review and release

    The report states its data basis, calculation path and limits. Review and release happen on your side under your quality system.

What we evaluate for this

Every number is computed and reproducible, predictions state their uncertainty. Every evaluation is documented with its input data and reasoning so your expert can review and sign it off.

  • Process modelled and optimised

    Process models, multi-objective optimisation, robustness, design space, established conditions, risk ranking, causal analysis, drift, Cpk and Ppk, and PPQ assessment.

  • Open parameters studied in a targeted way

    Experimental designs to study open parameters in a targeted way, response surfaces and design space from DoE data.

  • Routine operation monitored

    Control charts and batch variability for monitoring in routine operation.

Who it is for

For process development, CMC and manufacturing teams at CDMOs, generics manufacturers and specialty chemicals companies who need to make a process capable, secure it or justify it for submission.

What the computation does not replace

  • A model is only as good as the data. Few batches or a narrow parameter range limit what can be derived with confidence.
  • Cpk assumes a stable process in statistical control. If it is not, we show that instead of calculating a number that means nothing.
  • A derived design space has to be confirmed experimentally before it goes into a submission.

Common questions

What is the difference between Cpk and Ppk?

Cpk uses within-subgroup variation and describes what the process can do in the short term. Ppk uses the overall variation across all data and describes what it actually delivered. If Ppk is well below Cpk, the process varies between batches or over time, and that is where CovaSyn starts the root cause analysis.

What to do when Cpk is too low?

First establish whether location or spread is the problem: a shifted mean can often be corrected through a set point, while too much spread needs the driving parameters. CovaSyn ranks the parameters by influence and shows where tighter control has the largest effect.

How do I define a design space under ICH Q8?

A model built from DoE or process data shows in which parameter ranges all critical quality attributes stay within specification, with a margin for model uncertainty. CovaSyn calculates design space and robustness and proposes NOR and PAR for your team to review.

How can I detect process drift early?

Control charts with run rules detect trends and shifts before a limit is crossed. A drift analysis across batch history adds which process parameter is linked to the shift. CovaSyn combines both.

Who can analyse our process data for us?

We do. In the initial call we go through the process and question and agree on data and scope. The report typically arrives within 5 working days once we have your complete data.

Free PDF

Results you can rely on

Our beginner's guide for chemistry, pharma and biotech: how to tell an estimate from a calculation, seven questions to ask of every result and six questions to ask every provider. 8 pages.

Get the guide

Next step

Tell us about your process problem.

30 minutes on Microsoft Teams with the CovaSyn team. If it is not a fit, we will say so.